Lucky Draw Flex 2x3

Lucky Winnergi Yum Saabibagi Terms and Conditions:

1. Construction Houba: Lucky winner oiba numittudagi 30 days faobagi manungda yum saaba houhanbigadabani.
2. ⁠Duration: Construction asi maximum 6 months faobada saaba loinsingadabani (aduna Lucky Winner na Mistree singda ayet- apan pibiroidabani)
3. ⁠ Lucky Winner’s responsibility: Mistry singgi thabak shufam, yot thekfam, potchei thamfam, peifamnachingbagi daita loubigadabani. Construction da changadaba esing-maisingisu sinbigadabani.
4. Sinmi Construction gi standard rate of construction makhaada pijari:
a. RCC BEAM: running feet ta Rs.150/-
b. RCC SLAB: Rs 150/- per sq.ft.(slab heibagi pharmaar puthokchagani, charge loujaroi)
c. RCC PILLAR: running feet ta Rs.150/-
d. BRICKWORK: Rs 9/- per brick
e. PLASTERWORK: Rs 25/- to Rs 30/- per sq ft
f. MAKHONG THAADABA: Rs 9,000/- to Rs 15,000/- per makhong
g. WATERTANK: Rs 8/- per litre
5. ⁠Mistry: Construction gi Mistry sing Sinmi Construction na puthokchaduna, Lucky Winnergi Yum saajagani. Mathakki point 4 da pijariba asi mistrigi rate oigani*
6. ⁠Construction materials: Lucky Winner gi apaamba makhalgi materials adu sijinnaduna yum adu shaajagani*
7. ⁠Video/photo: Construction site ta Sinmi Construction ki oiba photo and video coverage toujagani

*Total cost of construction is Rs 10,00,000/-. Hairiba total amount asi RCC khaktaga mari leinaba cost oigani (haibadi RCC construction gi material cost and RCC construction gi labour cost). Mathakki Point number 5 and 6 asi total cost youdrifaobagi oigani. Total cost hek youkhragadi, hairiba mathakki term number 5 and 6 asi chatnararoi.